Client
Semiconductor equipment manufacturer
Industry
Semiconductor & Electronics
Region
Hsinchu, Taiwan
Year
2025
The challenge
The client's production reports ran on a 15-year-old on-premise MES. Reports took hours to generate, and only two people in the company knew how the system worked.
Any change had to be made without stopping the production lines, which run 24/7.
What we did
We mapped every report and data source, then built a new reporting layer on Azure that reads from the existing MES without changing it.
The old and new systems ran side by side for six weeks while the client's engineers verified every report. Only then was the old reporting server switched off.
Services
Technologies
More Work
Client confidential
KYC Onboarding Platform for a Digital-Asset Fintech
3 days → 4 hrs average onboarding time
Read the story
Sample project
Client confidential
Bilingual B2B Customer Portal for an Electronics Distributor
60% fewer support emails
Read the storyHave a Project in Mind? Let's Talk.
Tell us what you are building. We reply within one working day, and we are happy to sign your NDA first.

